Downloads
Click to download our latest company and product information.

Head Office team donate to local food bank
The team at Crestchic’s head office in Burton-on-Trent have been collecting food which has been donated to the local YMCA foodbank. The foodbank, which is located in Hawkins Lane, is open to everyone in the local area. Those in need can self-refer for an emergency...

WHY USE A LOAD BANK?
Load banks are primarily used for testing electrical power output on diesel generators, gas turbines and UPS systems whilst carrying out commissioning and maintenance work.
The load banks are used for simulating real electrical loads enabling essential setup and commissioning which ensures that all electrical and control parameters are met prior to power generation/back up equipment being energized on line.