Crestchic Middle East leading manufacturer of load banks and transformers
  • Products
    • AC Resistive Load Banks
    • AC Resistive-Reactive Load Banks
    • AC Medium Voltage Load Banks
    • DataCentre 200kW Stackable Load Banks
    • DC Load Banks
    • Server Emulator Load Banks
    • Datacentre Load Bank Trailer
    • Aviation Ground Power
    • Transformers
    • Control Systems
    • Stock Sales Notices
  • Rental
    • Rental Services
    • Contact and Locations
  • Services & Spares
    • Commissioning Videos
  • Applications
    • Healthcare
    • Oil & Gas
    • Data Centres
    • Marine & Shipbuilding
    • Mining & Drilling
    • Container Ports
  • About Us
    • Downloads
    • History
    • Latest News
    • Case Studies
      • British Antarctic Survey
      • British Petroleum
      • Malta Dry Dock
      • MAN Diesel and Turbo
      • Seaking Electrical
  • Contact Us
  • Portal
  • Language
    • French
    • German
Select Page
Manchester airport in power failure “chaos” – (But what happened to the backup power?)

Manchester airport in power failure “chaos” – (But what happened to the backup power?)

Jun 8, 2023 | News

POWER FAILURE: On 24th May 2023, Manchester Airport hit the headlines, as a power outage saw check-in desks closed, flights grounded, and customers left frustrated and angry.  As the airport contends with the aftermath, including passengers who watched their flights...
Power failure is number one culprit in spiralling datacentre costs

Power failure is number one culprit in spiralling datacentre costs

Sep 28, 2022 | News

Data Centre outages are costing more, with power failure the number one culprit  Findings from Uptime Institute’s 2022 Global Datacentre Survey highlight the fact that downtime in the data centre industry is becoming increasingly expensive, with the main cause...
With the threat of winter power cuts looming, businesses must maintain their backup power – or risk costly downtime

With the threat of winter power cuts looming, businesses must maintain their backup power – or risk costly downtime

Aug 12, 2022 | News

Articles in the UK national press this week alluded to the possibility of winter power cuts as a direct response to the UK’s mounting energy crisis. Reports state that, under the government’s latest “reasonable worst case scenario” plan, businesses and households...
Power failure is number one culprit in spiralling datacentre costs

Crestchic: ITN suffers mass power outage after back-up generators fail to start

Apr 7, 2022 | News

ITN faced significant disruptions earlier this week (April 2022) after a “significant” power outage hit the production company’s HQ in central London. Back up generator failure Reports of the event suggest that the power failed and the back-up generator also...

Crestchic (UK) Limited

Crestchic Loadbanks is based in Burton Upon Trent, UK and has sales and rental offices around the world. Since 1983, Crestchic has remained the world’s largest specialised load bank manufacturer and load bank rental company. Crestchic’s load banks can be purchased or rented world wide.

Head office:

Crestchic (UK) Ltd
2nd Avenue,
Centrum 100
Burton-on-Trent.
DE14 2WF
United Kingdom

T: +44 (0)1283 531 645

Other links

  • Work For Us
  • Privacy policy
  • Terms & Conditions
  • Cookie Policy
  • Modern Slavery Act
  • Site links

Search

  • Crestchic UK
  • Crestchic Germany
  • Crestchic France
  • Crestchic Spain
  • Crestchic Ireland
  • Crestchic Asia Pacific
  • Crestchic USA
  • Crestchic Transformers
  • Facebook
  • Twitter
  • RSS
Website © Crestchic (UK) Limited