For generator manufacturer s that rely on load banks to test the generators they design and build, ensuring those load banks are working optimally is an essential part of their annual quality policy. For a globally renowned manufacturer of canopy generators,...
Vessel testing: Leading specialist in the construction and repair of vessels in the offshore area, Estaleiro Navship, commissioned Crestchic to complete futureproof upgrades to its load bank control system, replacing all elements and installing new insulated elements...
Naval Applications: Crestchic delivered formal load bank training to one of the most powerful naval forces in the world following the arrival of its 3000 kVA, 3-phase load bank with NOVA control hardware and Orion user interface. Arriving onsite, Steven Jewell,...
Germany Datacentre: Crestchic has delivered essential upgrades to the load bank controller system for one of Germany’s largest data centres. Due to advancements in microprocessor technology, components for the site’s Eclipse 3.1 load bank control system were becoming...
Load bank control: In addition to NOVA and ORION (mentioned last week – read more here: https://crestchicloadbanks-me.com/fibre-optic-nova-control-system-is-a-winner-with-customers/), our tech team have developed the load bank control module, Gemini, for the...