Crestchic Loadbanks has supplied load testing solutions for one of London’s tallest and most high-tech tower blocks, heling to ensure that back up power systems will operate in the event of a power failure. At 288 metres high, 22 Bishopsgate is one of the tallest...
A new study carried out by Aachen University has found that 5G mobile communications will drastically increase the demand for energy at data centres. This increased demand. argues Paul Brickman from Crestchic load banks, puts additional pressure on data centre...
In this article Paul Brickman of Crestchic, the leading global manufacturer of loadbanks used for power testing in the marine sector, looks at how the market and its needs are changing. Meeting the power needs of ‘super vessels’ In recent times we have witnessed a...
The container shipping industry is an ever-growing, fast-paced environment, and power infrastructure cannot always grow in-line with power requirements. For this reason, many container ports are choosing to expand their power capacity by using stand-alone temporary...
A 10MVA load bank package operating at 11.5kV has been set up at Canary Wharf by Crestchic Loadbanks, the leading manufacturer and provider of load bank testing equipment. The load test equipment will remain on site while the regular planned maintenance programme is...