This week, Storm Arwen wreaked havoc across the UK, with tens of thousands of homes and businesses experiencing power cuts. At one point on Friday 26th November, 74,000 customers were without power in England’s North West region, along with a further 88,000 in...
Data centre uptime: Crestchic Loadbanks, a leading supplier of load testing equipment based in the UK, has reported strong growth so far this year, with a significant amount of business coming from the growing data centre market. As the world reels from the impact of...
When it comes to forecasting energy usage, power suppliers turn to tried and tested data, looking back at historical figures to predict future demand. For a global pandemic such as the one we’re currently navigating, there is no formula, no data and no way of...
Crestchic Loadbanks has launched a trailer-mounted load bank solution, designed to meet the growing demand for transportable load banks at data centres with multiple generators. With more than 35 years of experience in the design and supply of load banks and testing...
Crestchic Loadbanks has supplied load testing solutions for one of London’s tallest and most high-tech tower blocks, heling to ensure that back up power systems will operate in the event of a power failure. At 288 metres high, 22 Bishopsgate is one of the tallest...