Load Bank Controls: Crestchic’s new NOVA load bank control system is now in full production. This is the hardware platform that replaces the previous SOLAR MCS system. Likewise, the ORION AC control software supersedes the ECLIPSE program, and can be run on our new...
Data centre uptime: Crestchic Loadbanks, a leading supplier of load testing equipment based in the UK, has reported strong growth so far this year, with a significant amount of business coming from the growing data centre market. As the world reels from the impact of...
Crestchic Loadbanks has recently taken delivery of a couple of new Mercedes HIAB vehicles for the growing fleet which deliver winning safety and environmental benefits. A Mercedes-Benz ACTROS 2540 30ft HIAB rigid lorry with mounted crane, which has a 10.7-litre...
ULEZ friendly: Burton-based Crestchic Ltd, the acknowledged world leader in the manufacture, sales and rental of loadbank testing equipment, has welcomed a new vehicle into its growing fleet. The Mercedes Benz Actros 2546 LS Tractor Unit is built to comply with...
Crestchic Loadbanks is expanding its hire and rental business, bringing the latest load bank and power testing solutions to the Irish market. As one of the world’s leading specialist manufacturers of load banks, Crestchic has the experience and expertise to...
With power resilience, fluctuating energy demand and a move toward sustainable power sources very much a hot topic at the moment, Crestchic loadbanks is pleased to be working with the University of Chester’s Energy Centre, providing the loadbanks required to support...
When it comes to forecasting energy usage, power suppliers turn to tried and tested data, looking back at historical figures to predict future demand. For a global pandemic such as the one we’re currently navigating, there is no formula, no data and no way of...
Crestchic, one of the world’s largest suppliers of load bank technology, has recently added vertical-discharge load banks to its rental fleet, offering customers a compact solution with a small operational footprint. Available as a 1000kW resistive-only load bank, the...
Crestchic Loadbanks has launched a trailer-mounted load bank solution, designed to meet the growing demand for transportable load banks at data centres with multiple generators. With more than 35 years of experience in the design and supply of load banks and testing...
Crestchic Loadbanks has supplied load testing solutions for one of London’s tallest and most high-tech tower blocks, heling to ensure that back up power systems will operate in the event of a power failure. At 288 metres high, 22 Bishopsgate is one of the tallest...