Investor Information
Please click to download the investor information below.
Crestchic Archive RNS Feed

Load Bank Control: New control module GEMINI delivers data from MV supply
Load bank control: In addition to NOVA and ORION (mentioned last week - read more here: https://crestchicloadbanks-me.com/fibre-optic-nova-control-system-is-a-winner-with-customers/), our tech team have developed the load bank control module, Gemini, for the medium...

WHY USE A LOAD BANK?
Load banks are primarily used for testing electrical power output on diesel generators, gas turbines and UPS systems whilst carrying out commissioning and maintenance work.
The load banks are used for simulating real electrical loads enabling essential setup and commissioning which ensures that all electrical and control parameters are met prior to power generation/back up equipment being energized on line.