In the eye of Storm Arwen: the true cost of lost power
This week, Storm Arwen wreaked havoc across the UK, with tens of thousands of homes and businesses experiencing power cuts. At one point on Friday 26th November, 74,000 customers were without power in England's North West region, along with a further 88,000 in the...

WHY USE A LOAD BANK?
Load banks are primarily used for testing electrical power output on diesel generators, gas turbines and UPS systems whilst carrying out commissioning and maintenance work.
The load banks are used for simulating real electrical loads enabling essential setup and commissioning which ensures that all electrical and control parameters are met prior to power generation/back up equipment being energized on line.