Crestchic Middle East leading manufacturer of load banks and transformers
  • Products
    • AC Resistive Load Banks
    • AC Resistive-Reactive Load Banks
    • AC Medium Voltage Load Banks
    • DataCentre 200kW Stackable Load Banks
    • DC Load Banks
    • Server Emulator Load Banks
    • Datacentre Load Bank Trailer
    • Aviation Ground Power
    • Transformers
    • Control Systems
    • Stock Sales Notices
  • Rental
    • Rental Services
    • Contact and Locations
  • Services & Spares
    • Commissioning Videos
  • Applications
    • Healthcare
    • Oil & Gas
    • Data Centres
    • Marine & Shipbuilding
    • Mining & Drilling
    • Container Ports
  • About Us
    • Downloads
    • History
    • Latest News
    • Case Studies
      • British Antarctic Survey
      • British Petroleum
      • Malta Dry Dock
      • MAN Diesel and Turbo
      • Seaking Electrical
  • Contact Us
  • Portal
  • Language
    • French
    • German
Select Page
Power failure is number one culprit in spiralling datacentre costs

Power failure is number one culprit in spiralling datacentre costs

Sep 28, 2022 | News

Data Centre outages are costing more, with power failure the number one culprit  Findings from Uptime Institute’s 2022 Global Datacentre Survey highlight the fact that downtime in the data centre industry is becoming increasingly expensive, with the main cause...
Crestchic Loadbanks to showcase power testing solutions at Enlit Asia

Crestchic Loadbanks to showcase power testing solutions at Enlit Asia

Aug 18, 2022 | News

Crestchic Loadbanks, a world leader in load bank power testing solutions, is set to showcase its range of load banks and power testing solutions at Enlit Asia, which takes place 20-22 September 2022 at BITEC, Thailand.  Members of the Crestchic team will be available...
Crestchic Loadbanks officially opens new factory, expanding manufacturing capacity by 60%

Crestchic Loadbanks officially opens new factory, expanding manufacturing capacity by 60%

Jul 7, 2022 | News

Crestchic Loadbanks, a global manufacturer of power testing equipment, marked the official opening of its new factory in early July. As well as significantly increasing manufacturing capacity and creating new jobs, the new factory will allow the company to meet the...
Three reasons why factory testing your backup generator is not enough

Three reasons why factory testing your backup generator is not enough

Apr 12, 2022 | News

When installing a new backup generator or uninterrupted power supply (UPS), many businesses still wrongly believe that factory performance testing before the equipment is shipped is enough to ensure reliable operation once installed. Here, we explore why this is not...
Power failure is number one culprit in spiralling datacentre costs

Crestchic: ITN suffers mass power outage after back-up generators fail to start

Apr 7, 2022 | News

ITN faced significant disruptions earlier this week (April 2022) after a “significant” power outage hit the production company’s HQ in central London. Back up generator failure Reports of the event suggest that the power failed and the back-up generator also...
« Older Entries

Crestchic (UK) Limited

Crestchic Loadbanks is based in Burton Upon Trent, UK and has sales and rental offices around the world. Since 1983, Crestchic has remained the world’s largest specialised load bank manufacturer and load bank rental company. Crestchic’s load banks can be purchased or rented world wide.

Head office:

Crestchic (UK) Ltd
2nd Avenue,
Centrum 100
Burton-on-Trent.
DE14 2WF
United Kingdom

T: +44 (0)1283 531 645

Other links

  • Work For Us
  • Privacy policy
  • Terms & Conditions
  • Cookie Policy
  • Modern Slavery Act
  • Site links

Search

  • Crestchic UK
  • Crestchic Germany
  • Crestchic France
  • Crestchic Spain
  • Crestchic Ireland
  • Crestchic Asia Pacific
  • Crestchic USA
  • Crestchic Transformers
  • Facebook
  • Twitter
  • RSS
Website © Crestchic (UK) Limited